Administration of the Snowy Mountains Scheme was strengthened with the authority’s establishment on 12 July 1949. Hydroelectric power generation was prioritized. Irrigation capacity expanded. Large-scale engineering challenges were addressed. Migrant labor supported construction. Energy production increased. The project transformed infrastructure development.